Continuous Migration with VBUC and MS Team System 2005

22. September 2009 09:59 by Mrojas in General  //  Tags:   //   Comments (0)

Prerequisites:

 

Performing Continuous Migration with the Artinsoft VBUC and MS Team System 2005 is simple.

The 4 main tasks are:

1. Configure The Microsoft Visual Studio 2005 to use your desired Team System Project.
          For details…

2. Upload an initial version of your VB6 code to the Source Control system. For details…

          Perform an initial migration an establish a baseline. For details…

3. After that you are all set and you can start doing incremental migration.
          For details and an example of continuos migration…